“The chandelier completely changed our dining room. It looks premium, warm, and much more expensive than expected.”
Elevate your space with this modern minimalist compressed sherpa sofa, a fluid wave-shaped design that redefines relaxed living. Crafted with vacuum compression technology, it ships compactly for effortless delivery through elevators and narrow doorways, ideal for apartments and small-space living. Upholstered in soft, plush sherpa fabric and filled with dense high-density sponge, it delivers enveloping, supportive comfort that wraps you in warmth.
| Description | |
| Product Type | Sofa |
| Number of Items Included | 1 |
| Style | Minimalist |
| Color | White |
| Occasion | Living Room |
| Seating Material | Sherpa |
| Frame Material | Sherpa, Sponge |
| Seat Back | Yes |
| Dimensions | |
| Overall Length | 22.83"/58cm |
| Overall Width | 62.99"/160cm |
| Overall Height | 29.92"/76cm |
| Features | |
| Seat Fill Material | High-Resilience Sponge |
| Arms Included | Armless |
| Foldable | No |
| Stackable | No |
| Height Adjustable | No |
| Preassembled | Yes |
| Note |
| Due to manual measurement, there may be a 0.4"-1.2" (1-3cm) difference in size. Additionally, slight color variations may occur due to lighting and monitor differences. Thank you for your understanding. |



See how customers style Lumendat lighting in their homes.